NSW Rugby League

Exercise and Training Facility

Suburb Sydney Olympic Park
Size 9.5 x 3.5m Training Pool

1.3 x 3m Ice Bath
1.3 x 3m Heated Bath

Coping Timeless Microgrip Light Grey Tiles
Lining Fully Tiled with Dark Blue Gloss Tile

Expertly designed and built, this training facility has it all.

To meet the needs of our elite Rugby League players, this state of the art training facility has a heated spa, ice bath and a training pool all in the one complex. The fully tiled training pool can be switched from hot to cold with the touch of a button.

Scope:

  • Construction of Training Pool shell
  • Preparation of shell for waterproofing membrane.
  • Application of Waterproofing membrane to Shells.
  • Fully tiled interior to approved tiles.
  • Installation of Ice & Heated Bath shells
  • Construction of Pool Filtration System
  • Stainless steel ladders and handrail as nominated on drawings.
  • Fit out of pool filtration plant room as per specification including all reticulation.
  • Installation of Electrical Control Board (ECB) for Pool
  • Installation of Chemical Dosing & Sanitizing Equipment
  • Installation of gas Heaters & boost pumps
  • Installation of chiller unit & boost pump

Enquire about a pool like this one

View Similar Projects