Manly Andrew Boy Charlton Aquatic Centre

Multi-Purpose Aquatic Complex

Suburb Manly
Size 8 Lane, 50m Outdoor Lap Pool

5 Lane, 25m Outdoor Training Pool

8 Lane, 25m Indoor Pool

Lining Fully Tiled

The recent upgrade of the Andrew Boy Charlton Aquatic Centre in Manly includes both indoor and outdoor training pools, an indoor leisure pool for children and spectator seating for 150 people.

There are two outdoor training pools: an 8 lane 50 metre pool and a 5 lane 25 metre pool both heated. Also outside is a shade covered baby and heated toddler pool with shaded seating areas.

The indoor facilities include an 8 lane 25 metre heated pool with ramp entry, a program pool for exercise and rehabilitation with ramp entry, spa pool, sauna and steam room facilities and a fun children’s play and leisure pool with a beach entry.

The pools at Manly Boy Charlton Swim Centre are heated to 27 degrees.

Scope

  • Construction of Pool Shell
  • Water testing to AS 3735
  • Preparation of shell for waterproofing membrane.
  • Application of Waterproofing membrane to Pool Shell.
  • Fully tiled interior to approved tiles.
  • Supply & Install Wet Deck Grating
  • Compliance To Fina Length
  • Stainless steel ladders and handrail as nominated on drawings.
  • Compliance & Certification to AS3000
  • Supply & installation Sunbather Pool Blanket
  • Supply & Install of All Pool Lane Ropes
  • Supply & Install Pool Starting Blocks
  • Supply & Install All other Pool Furniture
  • Manufacture & Install Depth Markers to RLSS Guidelines

Enquire about a pool like this one

View Similar Projects