Sydney Football Stadium
Community Pool Renovation
Suburb | Moore Park |
---|---|
Size | 50m Lap Pool |
Lining | Fully Tiled |
Crystal Pools renovated the main swimming pool at the Sydney Cricket Ground, now renamed Sydney Football Stadium, bringing the pool up-to-date with modern finishes and lighting.
The 50 metre swimming pool was fully re-tiled and and all lighting was replaced. The latest in LED lighting was installed for added clarity and density over halogen alternatives. LED are also the first choice for swimming pools due to their long life and low running costs.