Trinity Grammar School
New Aquatic Centre
Suburb | Summer Hill |
---|---|
Size | 50m Lap Pool |
Trinity Grammar School wanted a new aquatic centre to replace the school’s old 25m outdoor pool.
The new facility now consists of two quality swimming pools; a refurbished 25m pool and also a new 50m swimming pool underneath the school. We possessed the capabilities to construct the 50m basement pool and install a swimwall to divide the pool length, allowing water polo to be played.
Scope
- Construction of Pool Shell
- Water testing to AS 3735
- Preparation of shell for waterproofing membrane.
- Application of Waterproofing membrane to Pool Shell.
- Fully tiled interior to approved tiles.
- Supply & Install Wet Deck Grating
- Compliance To Fina Length
- Stainless steel ladders and handrail as nominated on drawings.
- Compliance & Certification to AS3000
- Supply & installation Sunbather Pool Blanket
- Supply & Install of All Pool Lane Ropes
- Supply & Install Pool Starting Blocks
- Supply & Install All other Pool Furniture
- Manufacture & Install Depth Markers to RLSS Guidelines
Challenges:
- Construction in high-density residential area to underground basement site.
- Large drop to site for deliveries and movement of materials
- Swimwall installation