Trinity Grammar School

New Aquatic Centre

Suburb Summer Hill
Size 50m Lap Pool

Trinity Grammar School wanted a new aquatic centre to replace the school’s old 25m outdoor pool.

The new facility now consists of two quality swimming pools; a refurbished 25m pool and also a new 50m swimming pool underneath the school. We possessed the capabilities to construct the 50m basement pool and install a swimwall to divide the pool length, allowing water polo to be played.

Scope

  • Construction of Pool Shell
  • Water testing to AS 3735
  • Preparation of shell for waterproofing membrane.
  • Application of Waterproofing membrane to Pool Shell.
  • Fully tiled interior to approved tiles.
  • Supply & Install Wet Deck Grating
  • Compliance To Fina Length
  • Stainless steel ladders and handrail as nominated on drawings.
  • Compliance & Certification to AS3000
  • Supply & installation Sunbather Pool Blanket
  • Supply & Install of All Pool Lane Ropes
  • Supply & Install Pool Starting Blocks
  • Supply & Install All other Pool Furniture
  • Manufacture & Install Depth Markers to RLSS Guidelines

Challenges:

  • Construction in high-density residential area to underground basement site.
  • Large drop to site for deliveries and movement of materials
  • Swimwall installation

Enquire about a pool like this one

View Similar Projects